Crossroads Middle School
STATUS: Construction
START DATE: September 2022
ANTICIPATED COMPLETION: July 2024
SUMMARY:
Construction of a new middle school • Located on property between Seven Hills Boulevard and Westbrook Creek Road and Garnet Drive in Northeast Paulding County • Currently in Design Phase and set to launch to Construction Phase in September 2022 • Includes 66 Instructional Units with a capacity of 1,050 FTE (students) per DoE Standards • Overall floor plan is 148,000 square feet • Includes general education and special education classroom spaces, Connection classrooms including Gym, Band, Choral, Art, World Language, and CTAE Computer Science and Engineering rooms, as well as media center and cafeteria with stage • Designed similarly to P. B. Ritch Middle School and Scoggins Middle School. • Intended to alleviate capacity issues specifically at McClure Middle School, but may also impact students currently assigned to Moses MS and East Paulding MS.
UPDATES:
-
Burnt Hickory Elementary School
STATUS: Completed
START DATE: Spring 2023
COMPLETED: January 2024
SUMMARY:
This project consists of two 1-story classroom additions for a total of 20 instructional units and an additional 24,000 SF to the existing building. The addition will also include complete support spaces (administrative offices, resource classrooms, storage spaces, and restrooms). Upon completion, the building capacity will increase to 1,200 FTE (students), similar in size to Abney and Shelton elementary schools.
UPDATES:
MEDIA:
-
North Paulding High School
STATUS: Construction Phase 2
START DATE: Spring 2023
COMPLETED: January 2025
SUMMARY:
• Project will be constructed in two phases. • 40 Instructional Units (Phase 2) including: Science Labs; CTAE Labs; Physical Education Space; Media Center Upgrades • Cover the open courtyard and convert into an expanded dining room (begins Phase 1). • Additional serving line in lunchroom. • 200+ additional parking spaces.
TIMELINE Phase 1 (approved - to begin spring of 2023) • Retaining wall construction and parking lot expansion. • Clearing, grading, ground contouring, water retention. • 6 mobile classrooms on parking lot. • Even though mobile classrooms will be placed on the parking lot, there will be a net increase of parking spaces in Phase 1 for August 2023. • Dining room expansion dried in but not yet complete Phase 2 (proposed) • Anticipated contract approval in summer of 2023 • 3-story, 40-classroom addition • Dining room expansion complete • Extra serving line • Media center upgrades • 6 mobile classrooms removed from parking lot • Anticipated opening date January 2025
UPDATES:
-
Roberts Elementary School
STATUS: Construction
START DATE: Spring 2024
ANTICIPATED COMPLETION:
- Sewer Project: Summer 2024
- Renovation/Modification Project: Summer 2024
- 16-Classroom Addition: Summer 2025
SUMMARY:
Renovation and Modification Projects: refresh the school’s systems and finishes. Partial funding by the GA DOE Capital Reimbursement Program reduces cost impact to PCSD.
- New LVT flooring; gym floor refinishing; new quarry tile; painting walls, doors, and trim
- New HVAC, fire alarm, intercom, LED lighting, and plumbing upgrades
- Addition of generator to maintain power for critical systems and areas
- New flat roof, new gutters and downspouts, and roof restoration services
- New cooler and freezer
- Repairs to doors, frames, windows, etc.
16-classroom addition: will bring the school to a grand total of 59 classrooms to accommodate the growing community.
- Includes new multi-purpose STEM Lab.
- Includes restrooms, staff workroom, and storage.
- Includes modifications to parking and driveways to accommodate new building and provide additional parking and vehicle queueing.
- Includes enclosed connection to main building for enhanced safety and security.
UPDATES:
PHOTOS & MEDIA:
-
Baggett Elementary School
STATUS: Construction
START DATE: Spring 2024
ANTICIPATED COMPLETION: July 2024
SUMMARY:
Robertson Loia Roof Architects was contracted to design the project in the Summer of 2023. • Scope includes both critical and non-critical infrastructure. • Partial funding by the GA DOE Capital Reimbursement Program reduces cost impact to PCSD. • RK Redding Construction has been contracted as the Construction Manager to complete this project. • Project is slated for completion in the Summer of 2024.
UPDATES:
PHOTOS & MEDIA:
-
Roberts Elementary School
STATUS: Construction
START DATE: Spring 2024
ANTICIPATED COMPLETION:
- Sewer Project: Summer 2024
- Renovation/Modification Project: Summer 2024
- 16-Classroom Addition: Summer 2025
SUMMARY:
Renovation and Modification Projects: refresh the school’s systems and finishes. Partial funding by the GA DOE Capital Reimbursement Program reduces cost impact to PCSD.
- New LVT flooring; gym floor refinishing; new quarry tile; painting walls, doors, and trim
- New HVAC, fire alarm, intercom, LED lighting, and plumbing upgrades
- Addition of generator to maintain power for critical systems and areas
- New flat roof, new gutters and downspouts, and roof restoration services
- New cooler and freezer
- Repairs to doors, frames, windows, etc.
16-classroom addition: will bring the school to a grand total of 59 classrooms to accommodate the growing community.
- Includes new multi-purpose STEM Lab.
- Includes restrooms, staff workroom, and storage.
- Includes modifications to parking and driveways to accommodate new building and provide additional parking and vehicle queueing.
- Includes enclosed connection to main building for enhanced safety and security.
UPDATES:
PHOTOS & MEDIA: